Charts to share
Five views of the record, drawn live from the sensors. Download any of them as an image for an article or a social post, or copy the code to embed the live chart on your own page. Please credit Rotunda Trust.
The building now
Loading the latest readings…
The king post figures are the air at the king post, 16 metres up and the highest position in the array, where the warmest and driest air gathers; the floor figures describe the space people stand in. The difference between them is one of the more useful things the record shows. Every figure above is either measured directly or derived from measurements by standard psychrometric relations. The moisture content of the timber itself is not measured.
Four ways to read the record. Click a box to change every chart below.
Temperature
Sunlight
Humidity
Moisture in the air
Condensation margin
Outside air against inside
Every opening is fixed. The two-day forecast read against the record, with the heating call estimated.
Wind
Rainfall
Why it matters
Timber takes its moisture from the air around it and changes size as that moisture changes. Held damp, it decays. Held very dry, it shrinks, checks and works loose at the joints and iron straps that hold this roof together. Between those extremes the level matters less than the movement: every swing is a cycle of strain at the connections, and two hundred years of them is what the condition survey is describing.
So the object of the exercise is a building that moves as little as possible, and the first step is to find out what it does now. The record below is that measurement, running since 30 July 2026.
What is measured, and what is not
Eight sensors report air temperature and humidity, each paired with a probe reading the temperature of a solid surface beside it, because condensation depends on how cold a surface is rather than on the humidity of the room. They sit at floor level, on a ring five metres up, at walkway level eleven metres up and at the king post 16 metres up, with four aspects on the ring so a building-wide condition can be told from a local one. A weather station outside supplies the comparison, and half-hourly observations from London City Airport supply the wind and cloud the site cannot measure reliably. The king post position has been measured since 22 September 2026, and the charts show it from that date.
The working range is 45 to 75 per cent relative humidity, held mostly between 55 and 65 per cent across the year. That is an engineering position, to be refined once a full year of measurement shows the climate the building makes for itself. Until then the charts mark only the zone above 80 per cent, where mould can germinate, and otherwise show what is there. Through the summer the building ran dry; since the autumn it has been damp, with the drum close to the 80 per cent at which mould can germinate. On autumn nights the drum has stayed about 3 degrees above the outside air and the floor slab about 5, from stored summer and ground heat that is now running down, so the damp will deepen through midwinter.
Every opening in the building is fixed: mesh insets in eight windows, panels in the two doors, holes at each of the twenty-four eaves, and the meshed opening at the apex. Air passes between low and high as the temperature difference dictates, and none of it can be adjusted. Any change to them would need listed building consent, with consultation with Historic England and the local planning authority. The conservation heating and ventilation strategy published with the code below is written to run in shadow against this record before anything is installed, so that any option can be weighed on evidence rather than assumption.
The full technical account is set out in What Historic Timber Needs: Live Monitoring and Forecast at the Rotunda (opens in a new tab): what the timber needs and why, what the first three months have shown, the instruments and how they are placed, how the outlook is forecast and how well it verifies, and the calibration of the array (PDF, eight pages). The instrument-by-instrument commissioning and calibration record is held by the Trust and available on request.
The formulas, the forecast model, the conservation heating control strategy and the record itself are published openly, with code under the MIT licence and text and data under Creative Commons Attribution 4.0: https://github.com/mjbt/timber-monitoring (opens in a new tab). To cite them: Rotunda Trust, Woolwich Rotunda monitoring record, https://doi.org/10.5281/zenodo.24247030 (opens in a new tab).
References
On the building: E. Cole, S. Newsome and V. McCaig, The Woolwich Rotunda: From Waltzes to Wargames (Liverpool University Press / Historic England, 2025); J. Clarke, “Cones, Not Domes”, Construction History 21 (2005). Standards and sources for the monitoring method are listed in the technical note. Charts show live measured data; brief gaps are radio weather, not building weather.